    O transformador de teste imerso em óleo da série YDJ 50 ~ 300kV é composto principalmente por: caixa de controle, transformador de teste, etc. Ele pode conduzir o teste de tensão suportável AC DC de frequência de energia para cabos, componentes elétricos, material isolante e pode personalizar níveis de tensão maiores (kV) e capacidade (KVA) etc.

    Detalhes do produto do transformador de teste de alta tensão imerso em óleo YDJ AC Hipot Tester



    YDJ Oil Immersed AC/DC Hipot Test Set

    Product Introduction:

    YDJ Oil Immersed AC/DC Hipot Test Set features a compact and lightweight design with high integration and versatile functionality. It is highly portable and user-friendly, making it especially suitable for AC/DC withstand voltage testing of electrical equipment, components, and insulating materials in power systems, industrial enterprises, mining facilities, and research institutions. This series is an essential solution for high-voltage testing applications.


    Product Characteristics:

    1、The high-voltage test transformer features premium material selection, ensuring reliable quality and stable performance.

    2、It offers a wide voltage margin and is designed with a compact corona ring and minimal partial discharge.

    3、Utilizing advanced insulation materials, the transformer achieves a compact structure and lightweight design.


    Announcements 

    1. Complete the circuit as you expected. The hull of testing transformer and operation system must be well connected to the ground. Testing transformer' high voltage X end and measured winding F end must bewell connected to the ground. 

    2. In the cascading testing, the low voltage of second and third testingtransformer's is X end, winding F end and HV winding X end must be connected to the hull of transformer. The second and third transformer'shull must be connected to the ground through insulating frame. 

    3. Before power on, the adapter must be on the “zero” and then can turn on and boost voltage. 

    4. Sooth boosting the voltage through the regulator hand wheel from zero. The methods: quick rising (20s); slow rising (60s); extreme slow rising. After rising the voltage to 75% of your target voltage, we should boost by 2% per second until to the target one. At the same time monitor the measured equipment and instrument. In the process of boosting, if there is any abnormal phenomenon, we should cut off the power or step down the voltage at once. 

    5. After testing, we should step down the voltage in several seconds to the zero and power off. 

    6. This production cannot be used in the other parameter which in not allowed. Except necessity of testing, get on the power or cut off is not allowed. 

    7. In the high voltage testing, not only get the operation manual familiar but also obey to the national standard.








    Você pode gostar também

    • Tem alguma pergunta!

      NÃO HESITE EM ENTRAR EM CONTATO CONOSCO A QUALQUER MOMENTO
      Contate-nos
    • Visite-Nos

      Edifício 6, Parque Industrial Óptico-Mecânico Optics Valley, 84 Gaoxin 5 Road,
      Zona de Desenvolvimento de Nova Tecnologia de East Lake, cidade de Wuhan, província de Hubei, China

    • Envia-nos um email

      qiao@hvtest.cc

    • Ligue para nós

      +86-15871365102